Matterport for construction progress records
Weekly, biweekly or milestone Matterport scans give the whole team the same site record. See what to capture at each stage and what each visit costs.
The short answer
Match the scan cadence to how fast the site changes: weekly from framing through finishes, every two weeks on steadier phases, and monthly or at milestones on slower jobs. The more often you scan, the less each visit costs. For a 25,000 sq ft job, a one-time capture is about $1,117, while a weekly visit is about $559.
Each visit produces a Matterport twin that PMs, owners and trades walk and measure in a browser, typically delivered within 24–48 hrs after capture. Post the link where the project already keeps its records.
Choosing a cadence
Weekly scans fit phases where a lot gets covered up quickly: framing, rough-in and drywall. Every two weeks works for steady interior build-out or multi-lot builder progress. Monthly scans suit long jobs, slow phases and owner reporting. Milestone scans, tied to events like pre-pour, pre-drywall and substantial completion, work well when the schedule is uneven.
Mixing is normal. Many teams run weekly during rough-in, then drop to monthly once finishes start. Set the cadence on the quote and adjust it as the schedule moves. A scan that is missed before a wall closes cannot be made up later, so build the pre-drywall dates into the schedule the same way you would an inspection.
What to capture at each stage
Before work starts, capture existing conditions. It settles later questions about what was damaged before mobilization and gives designers a measurable starting point.
Underground and slab: capture plumbing, conduit and embeds before the pour. Once the concrete is down, the scan is the only easy way to see where things went.
Framing and rough-in: this is the most valuable stage. Capture mechanical, electrical, plumbing and fire protection in every wall and ceiling before drywall or insulation closes it. When someone later needs to cut into a wall, the twin shows what is behind it.
Finishes and closeout: capture after drywall, after finishes and at punch. The closeout twin becomes part of the owner handover, a record they can keep using after the certificate of occupancy.
Cost per visit by cadence
Here is a worked example for a 25,000 sq ft interior, using the same re-scan pricing as our quote form.
One-time capture: about $1,117.
Weekly: about $559 per visit, or about $29,055 over 52 visits in a year.
Every 2 weeks: about $615 per visit, or about $15,980 over 26 visits in a year.
Monthly: about $726 per visit, or about $8,716 over 12 visits in a year.
Most jobs do not run a full year at one cadence, so the real total is the per-visit price times the visits you schedule. Travel is included within 30 miles (one way) of the nearest home city. Past that, travel is $1 per mile of the full round trip. Over 100 miles, travel is quoted by hand. This is only an estimate. There are limitations, and every project is custom-quoted. Contact Miro3D for an official quote.
Handing off to Procore and Autodesk
The handoff is usually the Matterport link. Post it in Procore or your Autodesk project wherever the team keeps daily records, drawings or photos, and label each link with its date and phase. Everyone opens the same week of the site from a browser, with no software to install.
When a BIM coordinator or surveyor needs a point cloud, add the E57 file for $199 per space. Scan-to-CAD and scan-to-BIM are custom-quoted. Only add these when someone on the job will open the files.
Site logistics and hosting
Plan for a safety orientation, the PPE the site requires and a scan window when trades are clear of the area. Tell the tech which zones are off limits and where lifts or overhead work are active.
Hosting is included for the first 6 months, which covers many phases. Jobs that run longer, or owners who want the record live after closeout, can keep it on Miro3D's account at $4 per Matterport Active Space per month or transfer it to their own Matterport account.
What progress scans are not
Matterport measurements are planning-grade. A progress twin is not a survey, not layout control and not a tolerance check. Keep the surveyor or terrestrial laser for anything that will be stamped. Use the twin for what the whole team will actually open: progress, RFIs, owner updates and closeout.
Hidden conditions stay hidden. A scan records what the camera can see on that day, which is exactly why timing the pre-drywall and pre-pour visits matters more than adding extra visits during finishes.
Frequently asked questions
How often should we scan a construction project?
Weekly during framing and rough-in, every two weeks on steady phases, and monthly or at milestones on slower jobs. Always scan before drywall.
How much does a construction progress scan cost?
It depends on size and cadence. For 25,000 sq ft, a monthly visit is about $726 and a weekly visit is about $559. Estimates only — every project is custom-quoted.
Can the Matterport be shared in Procore?
Yes. The usual handoff is the Matterport link posted in the project record, so anyone with access can open it in a browser.
How fast is each scan delivered?
The Matterport twin is typically delivered 24–48 hrs after capture, so the team sees the site while the week is still relevant.
Do we need a point cloud for progress tracking?
Usually not. Add an E57 when a BIM coordinator or surveyor will use it. CAD and BIM from the scan are custom-quoted.
Can owners and lenders view the progress scans?
Yes. Anyone with the link can walk the twin in a browser, so owners, lenders and remote stakeholders can see the site without a visit. Share each dated link with the people who need it.